Case Study: South Wales

RO Expansion

Consultancy
Improvement
Installation
System Design

RO Expansion

Due to an requirement for an increased in production we were asked to provide a solution for expanding an existing RO plant.

After a full design study, the solution was to add and new loop to the existing plant. This was achieved by removing parts of the plant and installing a six-vessel loop onto a new bespoke mounting frame within a small footprint. The design study exposed the need for an increased feed pressure, an extra boost pump to meet the new requirement was specified and installed.

At the same time, we replaced and upgraded the CIP heating shell and tube to exceed the new heating demanded caused by the installation of the new loop.

Enquire now

What was involved in the project?
The project involved expanding the existing RO plant by adding a new six vessel loop, upgrading feed pressure with an additional boost pump, and replacing the CIP heating shell and tube to meet the higher heating demand.
How long did it take?
The new loop was installed, wired, and fully commissioned within three days.
What was the client's feedback?
The client was delighted, as the installation was completed within the shutdown window and outperformed the design parameters.