Case Study: Craigavon

Seamless Automation Upgrade of Obsolete PLC

Consultancy
Obsolescence
Improvement
Installation
System Design

Seamless Automation Upgrade of Obsolete PLC

After a full review of the existing control system for an RO plant it was identified that the majority of automation items were at the end of their life cycle and were no longer supported.

A package was put together to replace the existing PLC with a new PLC in a standalone panel along with its associated IO. The existing instrumentation would be wired back to the new panel, allowing for expansion in the future.

The new software program and SCADA mimicked the existing operation, all existing setpoints, process and CIP were replicated in the new package. This allowed for a smooth change over from an operators point of view, as there was no change in the operation of the plant.

Due to very short shutdown windows, meticulous planning was required and the change over was accomplished in three different phases. Each phase bought part of the new system online until following the final phase, all of the original equipment was removed.

Enquire now

What was involved in the project?
Identifying obsolete equipment, planning for it's phased replacement and installing a new PLC with associated IO.
How long did it take?
Several months of planning and liaising with the customer allowed a phased takeover of the existing plant with no additional downtime required.
What was the client's feedback?
Client was very pleased to be no longer reliant on obsolete equipment to be in control of a key piece of plant. They were very complimentary on how little interruption there was during the replacement.
Is David Kellett experienced in on-site installations?
All of our equipment requires installation on site. A dedicated project manager looks after each of our projects.